google-site-verification=9HAeym2bR6Q1OQQzpPrAwXSBuS49CWqDh49iM0hcfNk

Chemtronics

164,616 ft2 manufacturing plant. Building 1 (22,565 ft2), Building 2 (38,367 ft2), Building 5 (22,155 ft2), Building 6 (50,529 ft2), and Building 6 (50,529 ft2). A.L.M. Consulting Engineers provided a study and consultation for this project which required over 200 hours of engineering services.

The engineering services included on-site field investigations, heating and cooling load calculations, energy studies and preliminary HVAC equipment selections for two hot and chilled water central plants.

View More A.L.M. Consulting Engineers Projects